Case Comment

Allocation of the Risk of Constructing Electric Power Plants, In re Detroit Edison Co., Nuc. REG. REP. (CCH) 20,035 (Mich. Pub. Serv. Comm’n July 26, 1976)

Author:

Abstract

Keywords: Accounting, Electricity, Public utilities, Rate regulation, In re Detroit Edison Co., Nuc. REG. REP. (CCH) 20, 035 (Mich. Pub. Serv. Comm’n July 26, 1976)

How to Cite: (1976) “Allocation of the Risk of Constructing Electric Power Plants, In re Detroit Edison Co., Nuc. REG. REP. (CCH) 20,035 (Mich. Pub. Serv. Comm’n July 26, 1976)”, Washington University Law Review. 1976(3).